eBay Quicksilver

Share:
July 17, 2025

This new 16MW, 2 story data center included Day 1 loads of 4 MW expandable to 30 MW of concurrent maintainable high density racks up to and above 30 KW per rack.

AHA provided MEP/FP Design services. The design utilized 8 MW of fuel cells as the primary power source, and met eBay’s flexibility and reliability requirements with low PUE and free cooling, reliability, using both air cooling and liquid cooling in different parts of the facility.