CyrusOne

Share:
August 21, 2025

The new 182,000 SF complex combines a 10 MW, 100,000 SF data center with an 82,000 SF three-story office building.

AHA provided MEP/FP Design, and Energy & Sustainability services. The building’s infrastructure includes a below-grade duct bank from on-site substation to 15 kV switchgear. There are also multiple levels of redundancy available within the same footprint (e.g. N, N+1, 2N), 110 MW onsite substation, 300 kVA dual input PDUs with automatic transfer switches, scalable 2.25 MW Detroit Diesel dedicated generators pre-wired for additional capacity, and a 3,300 gallon belly tank each plus an added 6,000 gallon external tank for every two generators.